Once it exceeds this temperature, it is necessary to shut down in time for comprehensive inspection to prevent equipment failure and accidents. The safety plate of the aggregation crushing value conclusion also needs to be installed in place.

Once the load is too large or foreign matters enter the crushing chamber, the equipment may be damaged. At this time, it is necessary to check and replace the damaged parts in time. Aggregate crusher needs no-load start before formal operation, and then starts feeding after the equipment fully works normally and reaches the rated power and revolution, so as to ensure the stability of feeding and discharging system.

In addition, during the operation of aggregate crusher, it is also necessary to pay attention to some safe operation matters. When aggregate crushing value conclusion, it is not allowed to carry out any maintenance and inspection to prevent personal safety accidents.