After starting the barite ore grinding plant, ensure that there are no people standing on both sides of the equipment. Carefully check the cooling system of high-low lubrication station and main bearing, and ensure normal operation through test.

Before the initial operation, the high-pressure and low-pressure lubrication device shall be started, and the high-pressure system shall float the cylinder to ensure the production of oil film with sufficient strength.

At the same time, cooling water shall be opened for bearing cooling. After the inspection, the barite ore grinding plant commissioning can be carried out.

Generally, the barite ore grinding plant commissioning is divided into no-load commissioning and load commissioning.