The core part of customized hotel furniture is drawing deepening. Only when drawing deepening is in place, it is possible to produce furniture with reasonable structure and reasonable proportion. If the hotel furniture is not properly decomposed, it will not meet the designer’s design concepts and requirements; if statistics are not in place, it will lead to chaos on the scene. If the number is small, it will not be enough, and if there is more, there will be no place to put it; The effect is not in place, or rework causes huge economic losses. The following Hilton Hotel Furniture For Sale Manufacturer will take you to find out:

1. After the completion of the project, the project team must meet to review the production process, communication process and furniture quality and other issues, and implement continuous quality improvement.

2. Each project will automatically form a project team, from documentary, production, inspection to documents, which is convenient for information feedback and handling of unexpected quality events.

3. Deepen the three-layer review of drawings, the designer's self-inspection, the technical quality director review, and the project manager's approval can be sent to the production workshop.

4. Before each piece of furniture is produced, the design department shall print a one-to-one proofing drawing, and the business and design shall jointly explain the drawing and material requirements to the production department.

5. Each project forms a corresponding folder, unified management of each project's furniture and on-site drawings, distribution, modification, and archive one by one to achieve record management by dedicated personnel.