Observation Elevators Factory introduces the installation of elevator equipment. The work at this stage includes the installation of the traction machine, control panel, bottom counterweight and buffer in the machine room, the installation of the top car frame and safety gear, the car assembly, the installation of the traction working wire rope, the installation of control cables and electrical appliances Installation, installation of balance chain, speed limiter, wiring and slow driving, etc. Attentions at this stage: First, the elevator car gantry frame must be installed in place in the calibrated and straightened main guide rail in the highest hoistway.

 

After the main guide rail is installed in place, the traction machine in the machine room can be installed. This is the most critical point and requirement in elevator installation technology. Secondly, from the car top wheel→machine room traction wheel→guide wheel→top wheel on the counterweight, whether the verticality between them is correct depends on whether the four wheels are on a vertical line. As the reference point of the entire elevator, the top wheel of the elevator car must be in place on the top floor to ensure that the reference point is from the vertical line of the top wheel of the car to reverse the traction sheave, because these two points are close and it is easy to ensure its verticality . After hanging the vertical line, position the traction machine in the machine room, and then position the guide wheel and the counterweight top wheel. The purpose of this operation is to ensure accurate verticality between these points so that they are on the same vertical line. Then install the traction wire rope to ensure the same verticality as the calibrated and straightened guide rail in the hoistway. The correct installation method can ensure the overall verticality of the elevator installation, make the elevator run smoothly, make the user comfortable, and ensure the safety of the elevator equipment itself and the user's life and property.